HomeAboutServiceProductsProjectsGroupContact
Erected behind the Tate Modern this office and retail ensemble sets a further design highlight to this vibrant area south of the Thames

Schneider delivered the complete envelope package for all three buildings as well as atria roofs, internal wood cladding and glass balustrades.

The project-specific site logistics and the façade installation method – a combination of gantry unloading, vertical lifting system, floor plate distribution and installing of 3 m wide and floor high façade elements with manipulators from inside out – sets new industry standards.

Copyright SCHNEIDER GROUP | Privacy Policy | Imprint